1, Footwear testing items:
Material identification: upper, inner lining, insole, sole, etc.
Physical properties: folding resistance, abrasion resistance, peel strength, heel adhesion, hardness, etc.
Chemical safety: formaldehyde, banned azo dyes, odor, etc.
Sensory quality / color fastness to rubbing / marking
2, Leather and fur products testing items:
Material identification
Tearing force
Color fastness to rubbing
pH value
Formaldehyde content
Banned azo dyes
3. Testing items of belt products:
Material identification: belt surface, belt inside, etc.
Physical properties: binding force between buckle and belt body, belt body fracture, belt tooth bite force, belt body rubbing resistance, etc.
Chemical safety: formaldehyde, prohibited azo dyes, etc.
Color fastness to rubbing / appearance quality / marking / belt buckle
4. Inspection items for backpack products:
Material identification: fabric, lining, etc.
Physical properties: vibration impact performance, stitching strength, bag locks, fasteners, zippers, plastic buckles, straps, etc.
Chemical safety: formaldehyde, banned azo dyes, corrosion resistance of hardware accessories, etc.
Marking / color fastness to rubbing
5. Suitcase inspection items:
Physical properties: pull rod fatigue resistance, walking performance, vibration impact performance, drop performance, static pressure resistance of the hard box body, plastic hard box surface falling ball impact resistance, drum impact performance, box (bag) durability, box aluminum Mouth hardness, suture strength, etc.
Chemical safety: formaldehyde, banned azo dyes, corrosion resistance of hardware accessories, etc.
Material identification / color fastness to rubbing / marking
6. How much does the quality inspection report cost?
Answer: The quality inspection report fee is as low as 100 yuan, the lowest price in the industry. It depends on your project and cycle to make a quotation! Click on the consultation meeting on the right to arrange for an engineer to contact you!
7. How long is the quality inspection report cycle?
Answer: It can be delivered in as short as 1 day, the normal process is 3 days, and the project is complicated for about 5 days!